Fig. 7From: A hybrid RNN-GPOD surrogate model for real-time settlement predictions in mechanised tunnellingInvestigated surface area for settlement predictions. The surface is represented by 105 grid points (plus symbol); 11 points are selected as monitoring points (red points)Back to article page