Fig. 1From: A hybrid RNN-GPOD surrogate model for real-time settlement predictions in mechanised tunnellingFE model for shield tunnelling ekate with respective components. (1) surrounding soil, (2) TBM, (3) tunnel lining, (4) pressurisation of time-dependent grouting material and (5) representation of existing buildingsBack to article page